BMP Inspection Program
Regular maintenance is crucial to ensure that a water quality device effectively removes stormwater pollutants. Pursuant to Section 9-7-5 (d) 5 of the City of High Point Development Ordinance, engineered stormwater control structures must be inspected annually and the City is required to record the results and notify the responsible property owner or owner's association when maintenance or repairs are necessary. Upon inspection, if repairs are needed, the responsible party is given 90 days to make the necessary improvements. The City of High Point BMP Design Manual and the Stormwater BMP Maintenance Guidance Manual provides general design guidelines for major BMPs and recommended maintenance schedules. For more information about the maintenance and inspection of these devices, please contact the Stormwater Services Division at 336-883-3455.




Email
Print
High Point Public Services Dept., Stormwater Services Division