The City of High Point maintains a Stormwater Management Program to support and assist the residents of High Point with stormwater and runoff-related matters. As part of the continued progress of this program, the West Ray Area Project will strategically identify and address stormwater-related needs based on the existing conditions of infrastructure in that drainage area. A new design that helps to alleviate stormwater and runoff-related issues will be developed using cost-effective alternatives and input from citizens.
A questionnaire will be created and distributed within the study area to assess the watershed's conditions from the perspective of residents and property owners (historical flooding, drainage issues, erosion, etc.). Questionnaires will be mailed to residents, and they can submit their responses by:
The consultant team will complete stream walks and photo logs within the study area to verify data for the modeling analysis and stream assessment. The site visits will occur throughout the modeling and initial design phases of the project. Businesses and residents within the project area will be notified, at a minimum, one week before the staff will be on site.
If you have any questions about the West Ray Study and Preliminary Design Project, please contact Assistant Public Services Director Robby Stone at 336.883.3217 or robby.stone@highpointnc.gov.